Category: Eastwood Projects

Bagged C-10 – Episode 4: Making New Brake Lines From Scratch

While Adam had the bed off his C-10 for chassis refinishing, he decided to overhaul his old brake lines. The original equipment brake lines were rusting from the inside and showing signs of fatigue from past work. The original flares were leaking as well, and the heads of the fittings were getting rounded. They definitely […]

Mark’s Trans Am – Episode 10: Rustproofing the Insides of the Frame

Mark is back to work on the front subframe on the Trans Am project. Now that the outside of the metal is looking like new, he tackles rust prevention on the inside of the frame using Eastwood’s Internal Frame Coating Plus. Watch as shows how to apply this thick rust-stopping finish to the inner frame […]

Bagged C-10 – Episode 2: Making New Air Compressor Mounts

With the suspensions air tank freshly powder coated, work on our video producer Adam’s 1985 Chevy C-10 pickup project continues. As with other elements of this decade-old build, time has not been kind to some of the exterior hardware. The next components of the Air-Ride suspension to get his attention are the air compressors and their […]

Back To Top